Skip to content
Pre-Operational, Operational and Supervision Study for the Construction of the Puerto Bravo 500 kV Thermal Power Plant.PEPSA20222022-05-30T17:40:50+00:00
Cerro del Águila Hydroelectric Power Plant Operability StudyPEPSA20222022-05-30T17:34:15+00:00
Technical File for SACCO Siphon Pipe ReplacementPEPSA20222022-05-30T17:30:09+00:00
Environmental Impact Study for the 60 kV Electrical Utilization Line SE Barsi – SE LAP (Lima Airport Partners)PEPSA20222022-06-01T01:52:35+00:00
Detailed Environmental Plan (PAD) for Generation, Transmission and Distribution of ENOSA’s entire RTZPEPSA20222022-05-30T16:23:43+00:00
Definitive Engineering and Pre-Operational Study for the Humay 1000MW Thermal Power Plant and associated 500 kV substation.PEPSA20222022-05-30T16:53:56+00:00
EPCM LT 60 kV CT IQUITOS SE NUEVA IQUITOSPEPSA20222022-05-30T16:59:55+00:00
Pre-engineering for 500 kV Mantaro – Nueva Yanango – Carapongo and associated substations and 500 kV Nueva Yanango – Nueva Huánuco and associated substations.PEPSA20222022-05-30T17:07:44+00:00
Consulting, Supervision and Control of the Project to Increase Plant Capacity to 250 Tm/Day of Dicalcium Phosphate.PEPSA20222024-09-24T19:11:28+00:00
Feasibility Study of SAG Mill Turnaround under Major MaintenancePEPSA20222022-05-30T15:40:58+00:00
Page load link