Project Description

EIA of the 500 kV TL SEs – Marcona – Ocoña and 220 kV Link between the Existing SE Montalvo and the New SE Montalvo.

Banner Proyecto Abengoa Pepsa Tecsult

GENERAL DATA

  • Project: 9488
  • Location: The project will involve 4 regions or departments, 12 provinces and 48 districts:
    Lima:

    • Cañete: San Vicente de Cañete, Nuevo Imperial, Quilmaná, Coayllo, Asia, Mala, Calango, Santa Cruz de Flores, Chilca.

    Ica:

    • Chincha: El Carmen, Alto Larán, Chincha Alta, Grocio Prado, Pueblo Nuevo.
    • Pisco: Humay, Independencia.
    • Ica: Yauca del Rosario, Santiago, Los Aquijes, La Tinguiña, San José de Los Molinos, Salas.
    • Palpa: Santa Cruz,
    • Nazca: Marcona, Nazca, Changuillo.

    Arequipa:

    • Caylloma: Majes,
    • Caravelí: Ático, Chaparra, Chala, Atiquipa, Yauca, Jaqui, Acarí, Bella Unión, Lomas.
    • Camaná: Quilca, Samuel Pastor, Nicolás de Piérola, Mariscal Cáceres, Ocoña.
    • Arequipa: Santa Rita de Siguas, La Joya, Vítor.
    • Islay: Mollendo, Cocachacra, Punta de Bombón.

    Moquegua:

    • Mariscal Nieto: Moquegua.
  • Customer: ATS Abengoa Transmisión Sur S.A.

  • Owner: Peruvian State.

Transmission Lines

Lines: Chilca – Marcona Nueva
Voltage: 500 kV
Approx. length: 357 Km
Lines: Marcona Nueva – Ocoña Nueva
Voltage: 500 kV
Approx. length: 272 Km
Lines: Ocoña Nueva – Montalvo Nuevo
Voltage: 500 kV
Approx. length: 255 Km
Lines: Marcona Nueva – Marcona Existente
Voltage: 220 kV
Approx. length: 27 Km
Lines: Montalvo Nuevo – Montalvo Existente
Voltage: 220 kV
Approx. length: 5 Km

Electrical Substations

New: Marcona Nueva Ocoña Nueva Montalvo 2
Voltage: 500/220 kV 500 kV 500/220 kV
Enlargements: Chilca Marcona Montalvo
Voltage: 500 kV 220 kV 220 kV

Alcances del servicio

  • Identification of preliminary layout.
  • Preparation of the Terms of Reference for the Environmental Impact Study and the Citizen Participation Plan.
  • Management to obtain the approval of the Terms of Reference of the Environmental Impact Study and the Citizen Participation Plan.
  • Conducting participatory workshops before and during the preparation of the Environmental Impact Study.
  • Preparation of the Field Work Report, according to the Environmental Impact Study Guide for Electrical Activities.
  • Preparation of the Environmental Baseline, according to the schedule of activities of the environmental and social component.
  • Preparation of the Environmental Impact Study and delivery of said document to the Environmental Authority.
  • Holding of public hearings.
  • Management to obtain the Director’s Resolution that approves the Environmental Impact Study.