Project Description

Prefeasibility and Feasibility Study for 220 kV La Granja substation – Rio Tinto.

proyecto-SE-La-Granja-en-220-kV-Rio-tinto Pepsa Tecsult

GENERAL DATA

  • Project: 9575

  • Location: Northeastern highlands of Peru, district of Querocoto, province of Chota, Cajamarca Region.

  • Customer: Rio Tinto Minera Perú Limitada S.A.C.

proyecto-SE-La-Granja-en-220-kV-Rio-tinto Pepsa Tecsult

TECHNICAL DATA

Lines: Carhuaquero – La Granja
Voltage: 220 kV
Approx. length.: 38 Km
Substation: Carhuaquero (Ampliación) La Granja
Voltage: 220 kV 220/22.9 kV
proyecto-SE-La-Granja-en-220-kV-Rio-tinto Pepsa Tecsult
proyecto-SE-La-Granja-en-220-kV-Rio-tinto Pepsa Tecsult

Scope of service

  • Definition of the route layout.
  • Definition of the location of the departure and arrival substation.
  • Development of pre-feasibility engineering of the selected route in coordination with Rio Tinto Minera Peru.
  • Pre-operational study.
  • Technical-economic verification of project requirements.
  • Field studies and investigations: topography, geology, resistivity measurement.

220 kV transmission line Carhuaquero substation – La Granja substation.
Substation design: Carhuaquero substation expansion and new La Granja substation.
Design of telecommunications and SCADA digital control systems, with interconnection to COES-SINAC.
Measurements and cost estimates.