Project Description

Final Engineering and Environmental Impact Statement for La Ramada ES Project

Banner Proyecto-SE-La-Ramada-Pepsa Tecsult

GENERAL DATA

  • Project: 9564

  • District of Huamachuco, Province of Sanchez Carrion, Department of La Libertad.

  • Customer: Yamobamba Energy Company S.A.C.

Proyecto-SE-La-Ramada-Pepsa Tecsult

TECHNICAL DATA

Lines: V-1A – La Ramada La Ramada – V-1B
Voltage: 220 kV 220 kV
Approx. length.: 1,401 m 1,395 m
Substation: La Ramada
Voltage: 220 kV
Proyecto-SE-La-Ramada-Pepsa Tecsult
Proyecto-SE-La-Ramada-Pepsa Tecsult

Scope of service

  • Tap-off of the Kiman Ayllu – Cajamarca Norte 220 kV transmission line.
  • 220 kV double-terminal and double line transmission line to La Ramada substation.
  • La Ramada 220 kV substation.

Pre-operational study

  • Tap off of the Kiman Ayllu – Cajamarca Norte 220 kV transmission line.
  • 220 kV double-terminal and double line transmission line to La Ramada substation.
  • La Ramada 220 kV substation, 480 MVA transmission power, with bays for the incoming and outgoing 220 kV double-terminal transmission lines to Cajamarca Norte substation and Kiman Ayllu substation, as well as a 220/22.9 kV transformation bay.
  • Telecommunications and SCADA digital control system, with interconnection to XOES.

Transmission Line Environmental Impact Statement (DIA)