Project Description

Pre-Operational, Operational and Supervision Study for the Construction of the Puerto Bravo 500 kV Thermal Power Plant.

Plant N° 1 Arequipa Region

Banner-Central-Planta-Termica-Puerto-Bravo Pepsa Tecsult

GENERAL DATA

  • Project: 9631 – 9614 – 9591

  • Location: Districts of Mollendo and La Joya, provinces of Islay and Arequipa, Department of Arequipa.

  • Customer: Samay I S.A.

Service for the construction of the thermal plant puerto bravo LT 500 kV and associated SE.

  • Construction supervision.
  • Pre-operational study.
  • Operational study.
Proyecto Nodo Energético en-el-Sur-del-Perú Pepsa Tecsult

TECHNICAL DATA

Central: Puerto Bravo
Installed capacity: 616 MW (diesel B5) | 720 (natural gas)
Technology: Dual natural gas and diesel thermoelectric generation B5
Generation units: 4 gas turbines (154 MW each diesel B5 / 180 MW each gas)
Lines Puerto Bravo (GIS) – San José
Voltage: 500 kV.
Minimum capacity: 1,400 MVA.
Length: 58 Km.
Proyecto Nodo Energético en-el-Sur-del-Perú Pepsa Tecsult
Proyecto Nodo Energético en-el-Sur-del-Perú Pepsa Tecsult

Scope of service

  • Definition of route outline, where visits and tours of the route outlines will be made with a length of 58 km.
  • Definition of the departure substation in Mollendo.
  • Definition of the location of the arrival module at the San José substation owned by Cerro Verde.
  • Feasibility engineering of the transmission line project considering the selected route in coordination with Samay I.
  • Presentation of a Fast Track type study, which will consist of the following according to COES guidelines:
  • Executive summary of the project.
  • Project engineering: Substations and transmission line.
  • Power system studies: Load flow, short circuit analysis, electromagnetic transient studies and electromechanical transient studies – Observations.
  • Obtaining study approval.
1. Stage I: Commissioning of the 500 kV S.E. San José – S.E. Puerto Bravo link and energization of power transformers (Back Feed).

  • Executive summary of the project.
  • Steady state operation.
  • Short-circuit current calculations.
  • Protection coordination study.
  • Stability study.
  • Electromagnetic transient and energization studies.
  • Equipment factory test protocols.
  • Specification of measurement systems.

2. Stage II: Synchronization of the Puerto Bravo thermal power plant units.

  • Executive summary of the project.
  • Steady State Studies.
  • Protection Coordination Study.
  • Stability Study.
  • Equipment factory test protocols.
  • Specification of measurement systems.3.

Integración de ingeniería con estudios eléctricos, de acuerdo al PR-20 del COES.

Supervisión de las obras civiles, montaje mecánico, montaje electromecánico de la planta térmica, línea de transmisión y subestaciones, así como la supervisión de la seguridad y salud ocupacional del proyecto “Construcción de Planta Térmica Puerto Bravo, Línea de Transmisión 500 kV y Subestaciones”.